UK company is seeking joint venture or licencing agreements for its patented solution for energy storage and power generation

TechnologyVeľká BritániaTOUK20210727001
Offers
Summary: 
UK company has developed a new power cycle based on enhanced steam turbine condensing that provides dramatic efficiency increases on a wide range of energy storage and generation applications including thermal electric and hydrogen combustion, geothermal, bio-fuel generation and conventional power plants, reducing associated emissions and fuel consumption. UK company is looking for joint venture, licencing or financial agreements.
Description: 
The most common method for storing electricity on a bulk scale is currently pumped hydroelectric. This is comparatively expensive, has long build times, and a shortage of potential sites. Other methods include compressed air, thermal energy storage, and various battery technologies. For power generation, steam and gas turbine cycles largely dominate. This UK company's new approach uses a patented condenser method to extract energy from the steam turbine exhaust and heat pumps it to temperatures suitable for additional energy extraction. This provides dramatic efficiency increases on a wide range of energy storage and generation applications including thermal electric and hydrogen combustion, geothermal and bio-fuel generation and conventional power plants, reducing associated emissions and fuel consumption. This new process uses a heat pumping condenser method, air compressors with compression heat recovery, and air expander turbines. The air compressor and expanders can be arranged in brayton cycles where air compression heat is recovered to pre-heat the steam turbine flow. Where air and thermal storage are practicable, the compressor and turbines can separate as with adiabatic compressed air systems, the air being stored using off peak electricity and compression heat extracted for thermal storage. The main advantage is that the air compressor no longer presents a peak time energy drain, increasing peak power output. The condenser heat exchanger tubes use the airflow to absorb latent heat energy from the steam turbine exhaust and also to provide the air turbine expansion heat. These functions are enhanced by staged venturi effect nozzles on the air tubes. As the air accelerates through the tubes it is adiabatically cooled, increasing the temperature gradient between the air and steam exhaust. Since air is accelerated up to supersonic velocities, accelerations are performed in stages with intermediate heat absorbing sections to control the heat absorption rate and prevent steam freezing to the tube. When the air leaves the condenser, it is slowed in final nozzle stages, causing significant re-pressurisation heat between 200-240°C which is then used for energetic air turbine expansion. Efficiency is expected at around 80% based on data for the component cycles. These high efficiency levels can be achieved by limiting the most significant points where energy is lost – the air compression heat and the latent condensing energy are both recovered in a useable state. Installation costs for thermal electric energy storage enhanced by this method will be significantly less than the competing adiabatic compressed air whose efficiency it now matches, providing highly competitive net payback and estimated return on investments, particularly where existing power station equipment is repurposed. It also provides enhanced potential for wide ranges of other power generation applications. UK company is looking for partners from the power industry and seeking companies that can help bring this solution to the market. UK company is seeking a joint venture agreement or licencing agreement with power industry companies and also seeking financial agreements with investors.
Type (e.g. company, R&D institution…), field of industry and Role of Partner Sought: 
UK company is looking for engineering companies with expertise in the power sector. Also, power equipment manufacturers, who may want a competitive advantage for their own product can be an ideal partner to this company. Ideally turbine manufacturers are excellent potential partners. UK company is seeking a joint venture agreement or licencing agreement to bring the solution to the market and commercialization. UK company is also interested in financial agreements with investors.
Stage of Development: 
Proposal under development
Comments Regarding Stage of Development: 
The condensing system is largely based on air turbo-machinery and so is largely operationally mature. The main focus for development will be for the Venturi condenser heat exchanger tubes. A government funded Computational Fluid Dynamics(CFD) and design study at the UK National Engineering Laboratory is currently being undertaken to formalise the results, which the company plans to follow up with physical pressure testing. There are also letters from several operating companies regarding their interest in the technology, their potential participation and trialling of the product.
IPR Status: 
Patents granted
Comments Regarding IPR Status: 
Patent granted in US. European patent granted and validated in Belgium, Denmark, France, Germany, Ireland, Italy, Netherlands, Spain, Switzerland, and UK.
External code: 
TOUK20210727001